814.012
English is not an official language of the Swiss Confederation. This translation is provided for information purposes only and has no legal force.
Ordinance on Protection against Major Accidents
(Major Accidents Ordinance, MAO)
of 27 February 1991 (Status as of 1 November 2018)
Section 1 General Provisions
Art. 1 Purpose and scope
1 The purpose of this Ordinance is to protect the public and the environment against serious harm or damage resulting from major accidents.
2 It applies to:
- a.1
- establishments where the threshold quantities for substances, preparations or special wastes specified in Annex 1.1 are exceeded;
- b. 2
- establishments where an activity involving genetically modified or pathogenic organisms or alien microorganisms subject to compulsory containment is carried out which is to be assigned to Class 3 or Class 4 in accordance with the Containment Ordinance of 9 May 20123;
- c.4
- railway installations in accordance with Annex 1.2a;
- d.
- transit roads, as defined in the Ordinance of 6 June 19835 on Transit Roads, where dangerous goods are transported or transhipped in accordance with the Ordinance of 17 April 19856 on the Carriage of Dangerous Goods by Road (SDR) or the relevant international agreements;
- e.
- the Rhine, where dangerous goods are transported or transhipped in accordance with the Ordinance of 29 April 19707 on the Carriage of Dangerous Goods on the Rhine (ADNR);
- f.8
- pipeline installations as defined in the Pipelines Ordinance of 2 February 20009 which meet the criteria specified in Annex 1.3.
2bis The enforcement authority may exempt establishments under paragraph 2 letter b from the scope of this Ordinance that:
- a.
- only carry out Class 3 activities with organisms in accordance with Annex 1.4 which, due to their properties, cannot spread uncontrollably among the public and in the environment; and
- b.
- due to their hazard potential, cannot seriously harm the public or the environment.10
3 In individual cases, the enforcement authority may make the following establishments, transport routes or pipeline installations subject to this Ordinance if, on account of their hazard potential, they could cause serious harm to the public or damage to the environment:11
- a.12
- establishments handling substances, preparations or special wastes;
- b.13
- establishments where an activity involving genetically modified or pathogenic organisms or alien microorganisms subject to compulsory containment is carried out which is to be assigned to Class 2 in accordance with the Containment Ordinance, in consultation with the Swiss Expert Committee for Biosafety;
- c.
- transport routes outside establishments, where dangerous goods are transported or transhipped in accordance with paragraph 2;
- d.14
- pipeline installations as defined in the Pipelines Ordinance of 2 February 2000 which do not meet the criteria specified in Annex 1.3.15
4 This Ordinance does not apply to installations and forms of transport which are subject to legislation on nuclear energy and radiological protection, insofar as the associated radiation could cause harm to the public or damage to the environment.16
5 The provisions of Article 10 EPA are directly applicable to establishments or transport routes which, in the case of exceptional events, could cause serious harm to the public or damage to the environment not arising from substances, preparations, special wastes or dangerous goods, or from genetically modified or pathogenic organisms or alien organisms subject to compulsory containment.17
1 Amended by No II 8 of the O of 18 May 2005 on the Repeal and Amendment of Ordinances in connection with the Commencement of the Chemicals Act, in force since 1 Aug. 2005 (AS 2005 2695).
2 Amended by No I of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337).
3 SR 814.912
4 Amended by No I of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337).
5 [AS 1983 678. AS 1992 341 Art. 7]. Now: Transit Roads Ordinance of 18 Dec. 1991 (SR 741.272).
6 [AS 1985 620, 1989 2482, 1994 3006, 1995 4425 Annex 1 No II 11 4866, 1997 422 No II, 1998 1796 Art. 1 No 18 and Art. 6, 1999 751 No II, 2002 419 1183. AS 2002 4212 Art. 29 para. 1]. Now: the O of 29 Nov. 2002 (SR 741.621).
7 [AS 1971 1957, 1977 768, 1983 486, 1987 1454, 1990 1356]. Now: O of 29 Nov. 2001 (SR 747.224.141).
8 Inserted by No I of the O of 13 Feb. 2013, in force since 1 April 2013 (AS 2013 749).
9 SR 746.11
10 Inserted by No I of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337).
11 Amended by No I of the O of 13 Feb. 2013, in force since 1 April 2013 (AS 2013 749).
12 Amended by No II 8 of the O of 18 May 2005 on the Repeal and Amendment of Ordinances in connection with the Commencement of the Chemicals Act, in force since 1 Aug. 2005 (AS 2005 2695).
13 Amended by No I of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337).
14 Inserted by No I of the O of 13 Feb. 2013, in force since 1 April 2013 (AS 2013 749).
15 Amended by Annex 5 No 2 of the Containment O of 25 Aug. 1999, in force since 1 Nov. 1999 (AS 1999 2783).
16 Amended by No I of the O of 13 Feb. 2013, in force since 1 April 2013 (AS 2013 749).
17 Amended by No I of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337).
Art. 2 Definitions
1 An establishment comprises installations as defined in Article 7 paragraph 7 EPA which have closely related operations and are in close proximity to each other (operating area).
3 The hazard potential is the sum of the effects which could arise from the quantities and properties of the substances, preparations, special wastes, organisms or dangerous goods in question.2
4 A major accident is an exceptional event occurring in an establishment, on a transport route or in a pipeline installation which has significant effects:3
- a.
- outside the operating area;
- b.
- on or near the transport route;
- c.4
- near the pipeline installation.
5 The risk is determined by the extent of the possible harm to the public or damage to the environment resulting from major accidents and the likelihood of their occurrence.
1 Repealed by No I of the O of 29 April 2015, with effect from 1 June 2015 (AS 2015 1337)
2 Amended by No I of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337).
3 Amended by No I of the O of 13 Feb. 2013, in force since 1 April 2013 (AS 2013 749).
4 Inserted by No I of the O of 13 Feb. 2013, in force since 1 April 2013 (AS 2013 749).
Section 2 Principles of Prevention
Art. 3 Safety measures1
1 The person responsible for an establishment, a transport route or a pipeline installation shall take all appropriate measures to reduce risk that are available in accordance with the state of the art of safety technology, supplemented by personal experience, and which are economically viable. These shall include measures to reduce the hazard potential, to prevent major accidents and to limit the effects thereof.2
2 When measures are selected, account shall be taken of operational and local factors which could cause major accidents, as well as actions of unauthorised persons.
3 When measures are implemented, account shall be taken in particular of the principles laid down in Annex 2, and in particular the measures in accordance with Annexes 2.2-2.5.3
1 Amended by No I of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337).
2 Amended by No I of the O of 13 Feb. 2013, in force since 1 April 2013 (AS 2013 749).
3 Amended by No I of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337).
Art. 41
1 Repealed by No I of the O of 29 April 2015, with effect from 1 June 2015 (AS 2015 1337)
Art. 5 Summary report
1 The person responsible for an establishment must submit a summary report to the enforcement authority. It shall include:
- a.
- a concise description of the establishment, together with a general plan and information on the surrounding area;
- b.1
- a list of the maximum quantities of the substances, preparations or special wastes present in the establishment which exceed the threshold quantities specified in Annex 1.1, together with the applicable threshold quantities;
- c.2
- the risk report specified in Article 8 of the Containment Ordinance of 9 May 20123;
- d.
- documents drawn up in the preparation of any property and corporate liability insurance policies;
- e.
- details of safety measures;
- f.
- an estimate of the extent of possible harm to the public or damage to the environment resulting from major accidents.
2 The person responsible for a transport route shall submit a summary report to the enforcement authority. It shall include:
- a.
- a concise description of the structural and technical design of the transport route, together with a general plan and information on the surrounding area;
- b.
- data on the volume and structure of traffic on the transport route and accident statistics;
- c.
- details of safety measures;
- d.
- an estimate of the likelihood of a major accident causing serious harm to the public or damage to the environment.
3 The person responsible for a pipeline installation shall submit a summary report to the enforcement authority. It shall include:
- a.
- a concise description of the structural and technical design of the pipeline installation, together with a general plan and information on the surrounding area;
- b.
- data on the type, composition and physical state of the substances and preparations transported, together with the approved operating pressure and accident statistics;
- c.
- details of safety measures;
- d.
- an estimate of the likelihood of a major accident causing serious harm to the public or damage to the environment.4
5 The enforcement authority shall exempt the person responsible for a through road from the duty to submit a summary report if, based on the information available, it is able, without a summary report, to assess as valid the assumption that the likelihood of major accidents causing serious harm is sufficiently low.6
1 Amended by No II 8 of the O of 18 May 2005 on the Repeal and Amendment of Ordinances in connection with the Commencement of the Chemicals Act, in force since 1 Aug. 2005 (AS 2005 2695).
2 Amended by Annex 5 No 7 of the Containment O of 9 May 2012, in force since 1 June 2012 (AS 2012 2777).
3 SR 814.912
4 Amended by No I of the O of 13 Feb. 2013, in force since 1 April 2013 (AS 2013 749).
5 Inserted by No I of the O of 13 Feb. 2013 (AS 2013 749). Repealed by No I of the O of 29 April 2015, with effect from 1 June 2015 (AS 2015 1337)
6 Inserted by No I of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337).
Art. 6 Assessment of the summary report, risk report
1 The enforcement authority shall verify that the summary report is complete and correct.
2 In particular, it shall verify:
- a.
- in the case of establishments, whether the estimate of the extent of possible harm or damage (Art. 5 para. 1 let. f) is plausible;
- b.
- in the case of transport routes, whether the estimate of the likelihood of a major accident causing serious harm or damage (Art. 5 para. 2 let. d) is plausible;
- c.1
- in the case of pipeline installations, whether the estimate of the likelihood of a major accident causing serious harm or damage (Art. 5 para. 3 let. d) is plausible.
3 Following an on-site inspection, where appropriate, it shall assess the validity of the assumption that:
- a.
- in the case of establishments, serious harm to the public or damage to the environment arising from major accidents is not to be expected;
- b.
- in the case of transport routes, the likelihood of occurrence of a major accident causing serious harm or damage is sufficiently low;
- c.2
- in the case of pipeline installations, the likelihood of occurrence of a major accident causing serious harm or damage is sufficiently low.
3bis The enforcement authority shall set out the results of its assessment in writing.3
4 If the assumption in accordance with paragraph 3 is not valid, it shall order the person responsible to prepare and submit to it a risk report in accordance with Annex 4.4
1 Inserted by No I of the O of 13 Feb. 2013, in force since 1 April 2013 (AS 2013 749).
2 Inserted by No I of the O of 13 Feb. 2013, in force since 1 April 2013 (AS 2013 749).
3 Inserted by No I of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337).
4 Amended by No I of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337).
Art. 7 Assessment of the risk report
1 The enforcement authority shall review the risk report and assess whether the risk is acceptable. It shall set out its assessment in writing.1
2 When evaluating the acceptability of the risk, it shall take account of local risk factors and pay particular attention to the fact that the likelihood of occurrence of a major accident must be all the lower:
- a.2
- the more the need to protect the public or the environment against serious harm or damage arising from major accidents outweighs private and public interests in the operation of an establishment, a transport route or a pipeline installation;
- b.
- the greater the extent of the possible harm to the public or damage to the environment.
1 Amended by No I. of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337).
2 Amended by No I of the O of 13 Feb. 2013, in force since 1 April 2013 (AS 2013 749).
Art. 8 Additional safety measures
1 If the risk is unacceptable, the enforcement authority shall order such additional measures as may be required. If necessary, these may include restrictions or prohibitions on operations and traffic.
2 In the case of measures for which a different public body is responsible, the enforcement authority shall submit appropriate requests to the competent authority. If necessary, the Federal Council shall coordinate the adoption of measures.
Art. 8a1Change in circumstances
1 If the person responsible has prepared a summary report, but not a risk report and if the circumstances change significantly thereafter or relevant new findings become available, they must amend the summary report and resubmit it to the enforcement authority.
2 If the person responsible has prepared a risk report and the circumstances change significantly thereafter or relevant new findings become available, they must:
- a.
- amend the risk report and resubmit it to the enforcement authority;
- b.
- amend the summary report instead of the risk report and resubmit it to the enforcement authority if:
- 1.
- serious harm to the public or to the environment from major accidents need no longer be expected,
- 2.
- in the case of transport routes and pipeline installations, the probability of a major accident causing serious harm is sufficiently low.
1 Inserted by No I of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337).
Art. 8b1Inspections
1 In order to verify if the person responsible is fulfilling their duties under this Ordinance, the enforcement authority shall conduct regular on-site inspections. It shall set out its assessment in writing.
2 The enforcement authority shall decide on the frequency of inspection based on the hazard potential, the type and complexity of the establishment, transport route or pipeline installation and the results of earlier inspections.
1 Inserted by No I of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337).
Art. 9 and 101
1 Repealed by No I of the O of 29 April 2015, with effect from 1 June 2015 (AS 2015 1337)
Section 3 Response to Major Accidents
Art. 11
1 The person responsible shall make every effort to respond to major accidents.
2 In particular, he shall:
- a.
- immediately tackle major accidents and notify the point of contact;
- b.
- immediately secure the accident site and prevent further effects;
- c.
- remedy any effects as soon as possible.
3 He shall submit a report to the enforcement authority within three months after the accident. The report shall include:
- a.
- a description of the course and effects of the major accident, and of the response provided;
- b.
- information on the effectiveness of the safety measures;
- c.
- an assessment of the accident.
4 If the person responsible is unable to draw up the report within the period specified, he must submit an application for an extension to the enforcement authority, stating the reasons, together with an interim report on the state of the investigations.
Section 3a Coordination with Spatial Planning Activities4
Art. 11a1…2
1 The cantons shall take major accident prevention into account in structure and land use plans and in their other spatial planning activities.3
2 For establishments, transport routes and pipeline installations, the enforcement authority shall designate the adjoining area in which the construction of buildings and installations may lead to a significant increase in the risk.
3 Before the competent authority makes a decision on a change to a structure or land use plan in an area as specified in paragraph 2, it shall obtain an expert opinion from the enforcement authority for risk assessment purposes.
1 Inserted by No I of the O of 13 Feb. 2013, in force since 1 April 2013 (AS 2013 749).
2 Repealed by No I of the O of 21 Sept. 2018, with effect from 1 Nov. 2018 (AS 2018 3505).
3 Amended by No I of the O of 21 Sept. 2018, in force since 1 Nov. 2018 (AS 2018 3505).
Section 45 Responsibilities of the Cantons
Art. 12 Point of contact
1 The cantons shall designate a point of contact, which is responsible for receiving notifications of major accidents at any time and immediately alerting the emergency services.
2 The cantons shall also ensure that a central office is designated, which immediately forwards notifications of major accidents to the National Emergency Operations Centre (NEOC) Emergency Desk (ASN).1
1 Amended by No I of the O of 13 Feb. 2013, in force since 1 April 2013 (AS 2013 749).
Art. 131Information and alerts
1 The cantons shall inform the public of:
- a.
- the geographical location of establishments and transport routes;
- b.
- the adjoining areas in accordance with Article 11a paragraph 2.
2 The cantons shall ensure that, in the event of a major accident, the population affected is informed in good time and, if necessary, alerted and advised how to act.
3 They shall also ensure that neighbouring cantons and states are informed in good time and, if necessary, alerted, if major accidents could have significant effects beyond cantonal or national borders.
1 Amended by No I of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337).
Art. 14 Coordination of emergency services
The cantons shall coordinate the emergency services with the responsible persons' emergency plans.
Art. 151Coordination of inspections
As far as possible, the cantons shall coordinate the inspections of establishments and transport routes which they are required to carry out under this and other legislation.
1 Amended by No I of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337).
Art. 16 Provision of information to the FOEN1
1 The cantons shall periodically provide the Federal Office for the Environment (FOEN) with information in the form of an overview of the hazard potentials and risks within their territory (risk register), together with the measures implemented.2
2 To this end, the competent federal and cantonal authorities shall make the necessary information available on request.
3 The above is subject to legal requirements concerning secrecy.
1 Amended by No I of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337).
2 Amended by No I of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337).
Section 5 Responsibilities of the Confederation
Art. 17 Data collection by the FOEN1
1 The competent federal and cantonal authorities shall forward to the FOEN on request any information collected in accordance with this Ordinance.
2 The FOEN shall ensure that the data is processed and made available to the competent authorities, insofar as this is necessary for the implementation of this Ordinance.
3 The above is subject to legal requirements concerning secrecy.
1 Expression in accordance with No I of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337). This amendment has been made throughout the text.
Art. 18 and 191
1 Repealed by No I of the O of 29 April 2015, with effect from 1 June 2015 (AS 2015 1337)
Art. 201Information
1 The competent federal authorities shall inform the public of:
- a.
- the geographical location of establishments, transport routes and pipeline installations;
- b.
- the adjoining areas in accordance with Article 11a paragraph 2.
2 In the event of major accidents which could have significant effects beyond national borders, the competent federal authorities shall inform the relevant Swiss missions abroad and the foreign authorities concerned.
1 Amended by No I of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337).
Art. 211
1 Repealed by No I of the O of 29 April 2015, with effect from 1 June 2015 (AS 2015 1337)
Art. 22 Guidelines
The FOEN shall, as required, publish guidelines which explain the essential provisions of the Ordinance; these include, in particular, the provisions concerning the scope of the Ordinance, safety measures, the preparation of the summary report and risk report, and the review and assessment thereof.
Section 6 Final Provisions
Art. 231Enforcement
1 The cantons shall enforce this Ordinance unless responsibility for enforcement is assigned to the Confederation.
2 When applying other federal acts or international agreements or resolutions relating to matters regulated by this Ordinance, federal authorities shall also be responsible for enforcing this Ordinance. Participation of the FOEN and the cantons is governed by Article 41 paragraphs 2 and 4 EPA; these provisions are subject to legal requirements concerning secrecy.
3 The FOEN shall specify the minimal geodata models and presentation models for official geodata in accordance with this Ordinance for which it is designated as the competent federal authority in Annex 1 of the Ordinance of 21 May 20082 on Geoinformation.3
1 Amended by No II 8 of the O of 2 Feb. 2000 to the Federal Act on the Coordination and Simplification of Decision-Making Procedures, with effect from 1 March 2000 (AS 2000 703).
2 SR 510.620
3 Inserted by Annex 2 No 5 of the O of 21 May 2008 on Geoinformation, in force since 1 July 2008 (AS 2008 2809).
Art. 23a1Amendment of Annexes
1 DETEC may, having consulted the persons concerned and insofar as is required by the state of the art in safety technology, the hazard potential and the volume of hazardous goods, amend Annexes 1.1 No 3 and 1.2a of this Ordinance.
2 DETEC may, in agreement with the Federal Department of Economic Affairs, Education and Research and the Federal Department of Home Affairs and having consulted the Swiss Expert Committee for Biosafety, amend the list in Annex 1.4 if new findings as to the properties of certain organisms so require.
1 Inserted by No I of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337).
Art. 24 Amendment of existing legislation
Art. 251
1 Repealed by No I of the O of 29 April 2015, with effect from 1 June 2015 (AS 2015 1337)
Art. 25a1Transitional provisions relating to the amendment of 13 February 2013
1 The person responsible for a pipeline installation shall submit the summary report (Art. 5 para. 3) to the enforcement authority no later than 5 years after this amendment to the Ordinance comes into force.
2 The enforcement authority shall waive the requirement to provide information in accordance with paragraph 1 in cases where it already has the necessary information.
1 Inserted by No I of the O of 13 Feb. 2013, in force since 1 April 2013 (AS 2013 749).
Art. 25b1Transitional provisions relating to the amendment of 29 April 2015
Persons responsible for establishments that fall within the scope of this Ordinance for the first time following the amendment of 29 April 2015 must submit the summary report to the enforcement authority at the latest three years after the said amendment to the Ordinance comes into force.
1 Inserted by No I of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337).
Art. 26 Commencement
This Ordinance comes into force on 1 April 1991.
Annex 1
Annex 1.11
(Art. 1 and 5)
Threshold quantities for substances, preparations or special wastes
1 …
2 Determination of threshold quantities
21 Substances or preparations
1 For substances or preparations listed in the table under number 3, the threshold quantities specified therein apply.
2 For other substances or preparations, the person responsible shall determine the threshold quantity using the criteria specified in number 4 in accordance with Annex I of Regulation (EC) No 1272/20082 and the criteria specified in number 5 for highly active substances and preparations. The lowest threshold quantity determined in this way is decisive.
3 The person responsible need not determine the threshold quantity for a criterion or area if he can argue convincingly that the costs of acquiring the data would be disproportionate.
22 Special wastes
The Federal Department of the Environment, Transport, Energy and Communications (DETEC) shall specify the threshold quantities for special wastes designated as such in the waste list issued in accordance with Article 2 of the Ordinance of 22 June 20053 on Movements of Waste. In doing so, it shall take account of their:
- a.
- health risks;
- b.
- physical risks;
- c.
- environmental risks;
- d.
- other risks.
3 Substances and preparations with specified threshold quantities
No | Substance name | CAS No1 | TQ (kg)2 |
1 | Acetylene | 74-86-2 | 5 000 |
2 | 4-Aminodiphenyl and its salts 3 | 500 | |
3 | Ammonium nitrate fertiliser with a nitrogen content ≥ 25 % | 20 000 | |
4 | Ammonium nitrate fertiliser with a nitrogen content ≥ 25 % and a verifiable negative detonation and smoulder test | 200 000 | |
5 | Arsenic(III) oxide, arsenic(III) acid and their salts | 1327-53-3 | 100 |
6 | Arsenic(V) oxide, arsenic(V) acid and/or their salts | 1303-28-2 | 1 000 |
7 | Benzidine and its salts 3 | 500 | |
8 | Gasoline (regular, super) | 200 000 | |
9 | Chlorine | 7782-50-5 | 200 |
10 | Chromium (VI) and its salts | 200 | |
11 | 1,2-Dibromo-3-chlorpropane3 | 96-12-8 | 500 |
12 | 1,2-Dibromethane3 | 106-93-4 | 500 |
13 | Diethyl sulfate3 | 64-67-5 | 500 |
14 | Dimethylcarbamoyl chloride 3 | 79-44-7 | 500 |
15 | 1,2-Dimethylhydrazine3 | 540-73-8 | 500 |
16 | Ethanol motor fuels4 | 200 000 | |
17 | Heating oil, diesel | 500 000 | |
18 | Hexamethylphosphoric triamide 3 | 680-31-9 | 500 |
19 | Hydrazine3 | 302-01-2 | 500 |
20 | Kerosene | 200 000 | |
21 | Methyl isocyanate | 624-83-9 | 150 |
22 | 2-Naphthylamine and its salts 3 | 500 | |
23 | Nickel compounds in inhalable powder form | 1 000 | |
24 | 4-Nitrodiphenyl3 | 92-93-3 | 500 |
25 | 1,3-Propane sultone 3 | 1120-71-4 | 500 |
26 | Sulphur dichloride | 10545-99-0 | 1 000 |
27 | Hydrogen | 1333-74-0 | 5 000 |
4 Ethanol fuels with various percentages of ethanol in gasoline |
4 Criteria for determining threshold quantities
41 Health risks
Criteria | Values for criteria | |||
TQ1 = 200 kg | TQ1 = 2000 kg | TQ1 = 20 000 kg | TQ1 = 200 000 kg | |
Classification/labelling2 | H330 | H3003, H310, H331, H370 | H3013, H3023, H311, H 312, H3144, H 332, H371 | |
|
42 Physical risks
Criteria | Values for criteria | |||
TQ1 = 200 kg | TQ1 = 2000 kg | TQ1 = 20 000 kg | TQ1 = 50 000 kg | |
Classification/labelling2 | H2003, H2013, H2023, H2033, H240, H241 | H220, H221, H224, H225, H226, H242, H250, H251, H252, H260, H261, H270, H271, H272 | H2224, H2234, H228 | |
|
43 Environmental risks
Criteria | Values for criteria | |||
TQ1 = 200 kg | TQ1 = 2000 kg | TQ1 = 20 000 kg | TQ1 = 200 000 kg | |
Classification/labelling2 | H400, H410 | H411 | ||
44 Other risks
Criteria | Values for criteria | |||
TQ1 = 200 kg | TQ1 = 2000 kg | TQ1 = 20 000 kg | TQ1 = 200 000 kg | |
Classification/labelling2 | EUH032 | EUH014, EUH029, EUH031 | ||
5 Highly active substances (HAS)
Criteria1 | Values for criteria | |||
TQ2= 20 kg | ||||
| <10 ìg/m3 | |||
| £ 10 mg | |||
c. CMR substances with major accident potential | Categories 1A and 1B | |||
|
1 Amended by No II para. 2 of the O of 29 April 2015 (AS 2015 1337). Revised by No II para. 1 of the O of 21 Sept. 2018, in force since 1 Nov. 2018 (AS 2018 3505).
2 Regulation (EC) No 1272/2008 of 16 Dec. 2008 of the European Parliament and of the Council on classification, labelling and packaging of substances and mixtures, amending and repealing Directives 67/548/EEC and 1999/45/EC, and amending Regulation (EC) No 1907/2006, OJ L 353 of 31.12.2008, S. 1; last amended by Regulation (EU) No 2016/1179, OJ. L 195 of 20.7.2016, p. 11.
3 SR 814.610
Annex 1.21
(Art. 1 and 5)
1 Repealed by Annex 5 No 2 of the Containment O of 25 Aug. 1999, with effect from 1 Nov. 1999 (AS 1999 2783).
Annex 1.2a1
(Art. 1)
Scope for railway installations
1 Track sections
The Major Accidents Ordinance applies to the track sections between the following operating points (with the exception of sections on foreign territory). The operating points are based on official geodata identifier 98.1 under the Ordinance of 21 May 20082 on Geoinformation (GeoIO).
Kilometre line | From operating point | To operating point | Usual name of the kilometre line on which the operating points lie |
100 | LS | STDG | Lausanne - Simplon Tunnel I - Iselle |
109 | BRTU | STDG(109) | Simplon Tunnel II |
131 | PDS | MTH | Les Paluds - St-Gingolph (Frontière) |
150 | LS | SJ | Lausanne - Geneva Airport |
151 | SJ | LPFR | Geneva St-Jean - La Plaine-Frontière |
152 | SJ | GEPB | St-Jean - Geneva-Eaux-Vives - Annemasse |
154 | FUBI | JON | Furet - Jonction |
160 | RENO | LTSE | Renens VD Ouest - Lausanne-Triage sect. |
161 | LTF | LONA | Lausanne-Triage F - Lonay A (bif) |
162 | LTP | LONB | Lausanne-Triage P1 - Lonay B |
164 | LECR | DENA | Lécheires - Denges A |
166 | RENO | LT | Renens VD Ouest - Lausanne-Triage Est |
169 | LTSE | BY | Lausanne-Triage sect. - Bussigny |
170 | LTE | LTS | Lausanne-Triage (Est - Sud) |
200 | RENO | DAIB | Renens VD Ouest - Vallorbe |
206 | RENO | BYE(206) | Renens VD Ouest - Bussigny Est |
210 | DAIB | BI | Daillens - Biel/Bienne |
260 | ZOLN | BIAE | Zollikofen Nord - Biel/Bienne Aebistr. |
265 | BIMA | BIO | Biel Mett Abzweigung - Biel/Bienne Ost |
266 | MAD | BIRW | Madretsch - Biel/Bienne RB West |
290 | WKD | THEG | Bern Wylerfeld - Thun |
291 | LGUS | WKD | Löchligut - Wankdorf |
299 | THAB | THSC | Thun Abzweigung - Thun GB - Thun Schadau |
300 | SPNI | BRLO | Spiez - Kandersteg - Brig |
302 | MGTN | MGTN(302) | Zweiter Mittalgrabentunnel |
310 | THEG | SPNI | Thun - Spiez - Interlaken Ost |
330 | WENE | STGE | Wengi-Ey - Lötschberg - St.German (Ost) |
331 | FERD | STGE(331) | Wengi-Ey - Lötschberg - St.German (West) |
332 | FRS | FRNP | Frutigen - Frutigen Nordportal (Ost) |
400 | LGUT | RTRW | Löchligut - Wanzwil - Rothrist West |
410 | OL | BI | Olten - Solothurn - Biel/Bienne |
450 | OLS | LGUS | Olten Süd - Bern |
451 | ABO | RTR(451) | Aarburg-Oftringen - Rothrist Gleis 1 |
453 | BFG | RTR(453) | Rothrist Ost - Rothrist Gleis 4 |
455 | UHDB | AESP | Unterhalden BE - Aespli |
456 | OHBD | AESP | Oberhard BE - Aespli |
457 | OHBD | MAT | Hardfeld (Spw) - Mattstetten |
459 | RUTT | LGUT(459) | Rütti - Löchligut |
500 | MU | RBG | Basel SBB - Olten - Lucerne |
510 | BSFR | BSW | Mulhouse-Ville - Basel SBB |
511 | BSO | BSNK | Basel SBB - Basel GB - Basel RB |
514 | BSW | BSO | SNCF Verbindungslinie |
518 | 8519315 | BAD | Müllheim (Baden) - Basel Bad Bhf |
520 | GELN | BAD | Gellert - Basel Bad DB |
521 | BSNK | MU | Umfahrung Süd: Basel SBB RB I - Muttenz |
522 | GELN | BSNK | Umfahrung Nord: Gellert - Pratteln |
523 | BAD | BSKE | Basel Bad RB - Kleinhünigen Hafen |
525 | BSNK | BSAU | Basel SBB RB - Basel Auhafen |
531 | OLN | OLO | Olten Verbindungslinie |
540 | OL | WOES | Olten - Wöschnau |
594 | RYSP | POZZ | GBT West |
595 | RYSP | GIDI | GBT Ost |
600 | IMW | CHIE | Immensee - Bellinzona - Chiasso |
601 | RYAB | ERNA(601) | Rynächt - Erstfeld Nord Gleis links |
604 | BRUA | SKN(604) | Brunnen - Sisikon (Gleis links) |
605 | SK | GRUO(605) | Sisikon - Gruonbach (Gleis links) |
606 | ALSA | ALME(606) | Al Sasso - Al Motto (binario sinistro) |
607 | MCEN | RIBN(607) | Mt. Ceneri - Rivera (binario destro) |
608 | MASN | LGN(608) | Massagno - Lugano (binario destro) |
630 | GIUS | CDO | Giubiasco - Locarno |
631 | CDO | PINC | Cadenazzo - Pino confine |
638 | BASM | CHSM | Balerna SM - Chiasso Smistamento |
639 | CHIE | CHSM | Monte Olimpino II - Chiasso Smistamento |
640 | BG | RU | Brugg - Rupperswil |
641 | RUO | RU(641) | Rupperswil Ost - Rupperswil Gleis rechts |
647 | BG | HDKN | Brugg - Hendschiken Nord |
648 | BGS | BGN | Brugg Süd - Brugg Nord (VL) |
649 | AA | WOET(649) | Aarau - Wöschnau Tunnel alt |
650 | KLWW | WOES | Killwangen West - Lenzburg - Däniken Ost |
653 | GEXO | IMW | Gexi Ost - Rotkreuz - Immensee West |
691 | RBL | KLWW | RBL Kopf Zurich - Killwangen West |
692 | RBLZ | RBLD | RBL Nord |
693 | RBLD | RBLE | RBL Mitte |
698 | KLWW | HBLO(698) | Killwangen West -411- Heitersbergl. Ost |
699 | SDO | EFG(699) | Neuer Bözbergtunnel |
700 | BG | PRO | Brugg - Pratteln Ost |
701 | EGL | STSO | Eglisau - Koblenz - Stein Säckingen Ost |
703 | ZSEO | GMT | ZH Oerlikon Nord - Wettingen - Gruemet |
704 | WUER | KLWW | Würenlos - Killwangen West (RBL) |
706 | ZSEO | OPS | Zurich Seebach - Glattbrugg Süd |
710 | ZASO | BG | Zurich HB - Brugg AG |
711 | ZASN | ZASS | ZH Hardbrücke - Kollermühle |
715 | ZASO | HRD | Zurich Altstetten Ost - Zurich Hard |
718 | ZAU | ZASS | ZH Aussersihl - ZH Altstetten Süd |
720 | ZAU | ZB | ZH Langstrasse - Thalwil - Ziegelbrücke |
721 | TW | TWS(721) | Thalwil - Thalwil Süd |
722 | ZAU | NIDS | ZH Langstrasse - Nidelbad - Litti |
723 | NIDS | TWNO | Nidelbad Süd - Thalwil Nord |
725 | NIDB | NIDO | Nidelbad - Nidelbad Ost |
751 | HUER | WNO | ZH Langstr. - Wallisellen - Winterthur |
752 | ZOEN | HUER | Zurich Oerlikon Nord - Hürlistein (Abzw) |
757 | KL | DORF | Kloten - Dorfnest (Überwerfung) |
760 | ZHDB | BUE | Zurich Hardbrücke - Bülach |
762 | NH | SH | Winterthur Nord - Schaffhausen RB Ost |
763 | BAD | 8519316 | Basel Bad Bhf - Waldshut - Schaffhausen |
764 | SH | EULG | Schaffhausen - Singen - Konstanz |
770 | BUE | NH | Bülach - Eglisau - Neuhausen |
824 | RH | KGHR | Romanshorn - Konstanz |
830 | WIL | WF | Wil - Weinfelden |
840 | WF | RH | Winterthur Nord - Romanshorn |
850 | GSS | WNO | St.Gallen - Winterthur Nord |
880 | TRUE | HAG | Sargans Ost - St.Gallen |
881 | SASL | TRUE | Sargans Schl. West - Schleife - Trübbach |
890 | SASO | ZB | Sargans Ost - Ziegelbrücke |
900 | SASO | CHW | Sargans Ost - Chur West (Gleisende) |
2 Freight installations
The Major Accidents Ordinance applies to the following freight installations:
- -
- Basel SBB RB (BSRB)
- -
- Zurich RB Limmattal (RBL)
- -
- Lausanne-Triage (LT)
- -
- Chiasso Smistamento (CHSM)
- -
- Geneva-La-Praille
1 Inserted by No II para. 1 of the O of 29 April 2015 (AS 2015 1337). Amended by No II para. 2 of the O of 21 Sept. 2018, in force since 1 Nov. 2018 (AS 2018 3505).
2 SR 510.620
Annex 1.31
(Art. 1)
Criteria for pipeline installations
1 Pipeline installations for the transport of gaseous thermal and motor fuels fall within the scope of this Ordinance if they meet the following criteria:
- a.
- the approved operating pressure is greater than 5 bar and less than or equal to 25 bar and the product of the approved operating pressure in pascals (Pa) and the external diameter in metres is greater than 500,000 Pa m (500 bar cm) («pressure» is to be taken to mean «positive pressure»); or
- b.
- the approved operating pressure is greater than 25 bar and the product of the approved operating pressure in pascals (Pa) and the external diameter in metres is greater than 1,000,000 Pa m (1,000 bar cm) («pressure» is to be taken to mean «positive pressure»).
2 Pipeline installations for the transport of liquid thermal and motor fuels fall within the scope of this Ordinance if, with an approved operating pressure of greater than 5 bar, the product of the approved operating pressure in pascals (Pa) and the external diameter in metres is greater than 200,000 Pa m (200 bar cm) («pressure» is to be taken to mean «positive pressure»).
1 Inserted by No II of the O of 13 Feb. 2013, in force since 1 April 2013 (AS 2013 749).
Annex 1.41
(Art. 1 para. 2bis)
List of organisms which, due to their properties, cannot spread uncontrollably among the public and in the environment
Deutscher Name | Nom français | Nome italiano | English name | Remarks |
Östliche Pferdeenzephalomyelitis | Virus de l'encéphalite équine de l'Est | Virus dell'encefalite equina dell'Est | Eastern equine encephalitis virus | Only if not working with insect vectors |
Hepatitis B Virus | Virus de l'hépatite B | Virus dell'epatite B | Hepatitis B virus | |
Hepatitis C Virus | Virus de l'hépatite C | Virus dell'epatite C | Hepatitis C virus | |
Hepatitis D Virus | Virus de l'hépatite D | Virus dell'epatite D | Hepatitis D virus | |
Hepatitis E Virus | Virus de l'hépatite E | Virus dell'epatite E | Hepatitis E virus | |
Hepatitis G Virus | Virus de l'hépatite G | Virus dell'epatite G | Hepatitis G virus | |
Humane Immundefizienz-Virus | Virus de l'immunodéficience humaine | Virus dell'immunodeficienza umana | Human immunodeficiency virus | |
Gelbfieber-Virus | Virus de la fièvre jaune | Virus della febbre gialla | Yellow fever virus | Only if not working with insect vectors |
Trypanosomen | Trypanosoma | Trypanosoma | Trypanosoma | If working with insect vectors |
Plasmodien | Plasmodium | Plasmodium | Plasmodium | If working with insect vectors |
Humanes T-lymphotropes Virus 1 and 2 | Virus T-lymphotropique humain 1 et 2 | Virus T-linfotropico dell'uomo 1 e 2 | Human T-lymphotropic virus 1 and 2 | |
Frühsommer-Meningoenzephalitis (FSME) | Virus de la méningo-encéphalite à tiques, (VMET) | Virus meningoencefalite da zecche (FSME) | Tick-borne encephalitis virus (TBE) | Only if not working with insect vectors |
Bovine spongiforme Enzephalopathie (BSE) | Encéphalopathie spongiforme bovine (ESB) | Encefalopatia spongiforme bovina (BSE) | Bovine spongiform encephalopathy (BSE) | |
Transmissible Spongiforme Enzephalopathie (TSE) | Encéphalopathies spongiformes transmissibles (EST) | Encefalopatie spongiformi trasmissibili (TSE) | Transmissible spongiform encephalopathies (TSEs) | |
Louping ill Virus | Louping ill Virus | Louping ill Virus | Louping ill virus | Only if not working with insect vectors |
1 Inserted by No II para. 1 of the O of 29 April 2015 (AS 2015 1337). Amended by No II para. 2 of the O of 21 Sept. 2018, in force since 1 Nov. 2018 (AS 2018 3505).
Annex 21
Safety Measures
1 Amended by No II para 2 of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337).
Annex 2.1
(Art. 3)
Procedure for establishments, transport routes and pipeline installations
When adopting safety measures, the person responsible for an establishment, transport route or pipeline installation must:
- a.
- select a suitable site or a suitable route and ensure that appropriate safety distances are maintained;
- b.
- establish the organisational requirements;
- c.
- arrange for the training of staff and the provision of information to third parties;
- d.
- establish the procedures for determining and evaluating major accident scenarios;
- e.
- establish the procedures for planning and implementing measures;
- f.
- arrange for the monitoring, servicing and review of the safety-critical components;
- g.
- establish the procedures for emergency planning;
- h.
- arrange for the systematic review of the organisational requirements and procedures and deal with change management (inside and outside the installations);
- i.
- document the significant results under letters b-h.
Annex2.2
(Art. 3)
Measures for establishments handling substances, preparations or special wastes
When adopting general safety measures, the person responsible for an establishment handling substances, preparations or special wastes must:
- a.
- as far as possible, replace dangerous substances or preparations with less dangerous ones, or limit the quantities thereof and as far as possible, avoid hazardous processes, methods or operating procedures;
- b.
- design load-bearing structures in such a way that no additional serious effects arise as a result of the stresses to be expected in the event of a major accident;
- c.
- install adequate warning and alarm systems;
- d.
- install suitable and reliable measurement or control systems, which, insofar as required for safety reasons, are multiple, of different types and operate independently of each other;
- e.
- install the necessary safety equipment and take the necessary structural, technical and organisational protective measures;
- f.
- monitor equipment and the operation of safety-critical components and carry out regular maintenance and inspections and document the checks;
- g.
- store substances, preparations or special wastes in an orderly manner, taking account of their properties, and keep up-to-date records of their quantities and location;
- h.
- deploy a sufficient number of suitably qualified staff, inform them about high-risk methods and processes used in the establishment, train them to prevent, limit and respond to major accidents, and ensure that the level of expertise is maintained in the event of staff changes;
- i.
- document any significant operational failures, their causes and the measures adopted, and retain the documents for a sufficient length of time;
- j.
- control access to the establishment;
- k.
- provide sufficient own resources for responding to major accidents, draw up an emergency plan for major accidents and discuss it with the emergency services, and carry out periodic exercises on the basis of this plan.
Annex 2.3
(Art. 3)
Measures for establishments handling microorganisms
When adopting general safety measures, the person responsible for an establishment where an activity involving genetically modified or pathogenic alien organisms or alien organisms subject to compulsory containment is carried out must:
- a.
- as far as possible, replace dangerous organisms with less dangerous ones;
- b.
- install suitable and reliable measurement or control systems, which, insofar as required for safety reasons, are multiple, of different types and operate independently of each other;
- c.
- install the necessary safety equipment and take the necessary structural, technical and organisational protective measures;
- d.
- monitor equipment and the operation of safety-critical components and carry out regular maintenance and inspections and document the checks
- e.
- install adequate warning and alarm systems;
- f.
- store organisms or special wastes in an orderly manner, taking account of their properties, and keep up-to-date records of their quantities and location;
- g.
- deploy a sufficient number of suitably qualified staff, inform them about high-risk methods and processes used in the establishment, train them to prevent, limit and respond to major accidents, and ensure that the level of expertise is maintained in the event of staff changes;
- h.
- document any significant operational failures, their causes and the measures adopted, and retain the documents for a sufficient length of time;
- i.
- provide sufficient own resources for responding to major accidents, draw up an emergency plan for major accidents and discuss it with the emergency services, and carry out periodic exercises on the basis of this plan.
Annex 2.4
(Art. 3)
Measures for transport routes
When adopting general safety measures, the person responsible for a transport route must:
- a.
- design the transport route in such a way that no additional serious effects arise as a result of the stresses to be expected in the event of a major accident;
- b.
- install the necessary safety equipment and take the necessary structural, technical and organisational protective measures;
- c.
- install adequate warning and alarm systems;
- d.
- monitor equipment and the operation of safety-critical elements of the transport route and carry out regular servicing;
- e.
- take the necessary traffic management or control measures for the transport of dangerous goods;
- f.
- collect, assess and pass on to the staff concerned any information available on the transport of dangerous goods;
- g.
- in cooperation with the emergency services, draw up an emergency plan for major accidents and carry out periodic exercises on the basis of this plan.
Annex 2.5
(Art. 3)
Measures for pipeline installations
When adopting general safety measures, the person responsible for a pipeline installation must:
- a.
- taking the surrounding area into account, install the necessary safety equipment and take the necessary structural, technical and organisational protective measures;
- b.
- collect, assess and pass on to interested third parties (e.g. staff, emergency services and land owners) any information available on the hazards posed by the thermal and motor fuels transported.
Annex 31
1 Repealed by No II para. 3 of the O of 29 April 2015, with effect from 1 June 2015 (AS 2015 1337)
Annex 4
Annex4.11
(Art. 6)
Establishments handling substances, preparations or special wastes
1 Principles
1 The risk report must contain all the information required by the enforcement authority in order to verify and assess, in accordance with Article 7, the risk posed by the establishment to the public or the environment. This includes, in particular, all the information listed in numbers 2-5.
2 In justified cases, certain items of information may be omitted or replaced by others which are equally valid or more appropriate.
3 The scope and degree of detail of the information given for each item will depend on the specific circumstances; in particular, consideration is to be given to the type of establishment, the hazard potential, the surrounding area and the safety measures.
4 Documentation used for the risk report, particularly test results, empirical data, literature references, results of calculations and detailed analyses, are to be kept at the disposal of the enforcement authority.
2 Basic data
21 Establishment and surrounding area
- -
- Description of the establishment, together with a site plan, including any licences, planning approvals or concessions,
- -
- characterisation of the establishment (main activities, organisational structure, number of staff, etc.),
- -
- details of the surrounding area, together with a general plan,
- -
- division of the establishment into study units and the reasons for this division.
22 List of substances, preparations or special wastes present in each study unit
- -
- Designation (chemical name, CAS number, trade name, etc.),
- -
- maximum quantity,
- -
- location,
- -
- details of physical and chemical properties.
23 Description of installations in each study unit
- -
- Structure of buildings,
- -
- methods and processes,
- -
- storage,
- -
- incoming and outgoing shipments,
- -
- provision of supplies and disposal,
- -
- installation-specific major accidents.
24 Safety measures in each study unit
- -
- Regulations applied and experience,
- -
- measures taken to reduce the hazard potential,
- -
- measures taken to prevent major accidents,
- -
- measures taken to limit the effects of major accidents.
3 Analysis for each study unit
31 Methods
- -
- Description of the methods used.
32 Hazard potentials
- -
- Overview and characterisation of the main hazard potentials.
33 Main major accident scenarios
331 Release process
- -
- Possible causes,
- -
- description of significant release processes,
- -
- estimate of the likelihood of occurrence, given the safety measures in place.
332 Effects of release
- -
- Description of effects, based on dispersion considerations,
- -
- estimate of the likelihood of occurrence, given the safety measures in place.
333 Consequences for the public and the environment
- -
- Description of the extent of possible harm to the public or damage to the environment,
- -
- estimate of the likelihood of occurrence, given the safety measures in place.
4 Conclusions
- -
- Account of the risk for each study unit, given the safety measures in place,
- -
- estimate of the risk posed by the establishment as a whole.
5 Summary of the risk report
- -
- Characterisation of the establishment and of the main hazard potentials,
- -
- description of the safety measures,
- -
- description of the main major accident scenarios,
- -
- estimate of the risk posed by the establishment as a whole.
1 Revised in accordance with No II 8 of the O of 18 May 2005 on the Repeal and Amendment of Ordinances in connection with the Commencement of the Chemicals Act, in force since 1 Aug. 2005 (AS 2005 2695).
Annex 4.21
(Art. 6)
Establishments handling organisms
1 Principles
1 The risk report must contain all the information required by the enforcement authority in order to verify and assess, in accordance with Article 7, the risk posed by the establishment to the public or the environment. This includes, in particular, all the information listed in numbers 2-5.
2 In justified cases, certain items of information may be omitted or replaced by others which are equally valid or more appropriate.
3 The scope and degree of detail of the information given for each item will depend on the specific circumstances; in particular, consideration is to be given to the nature of the establishment, the hazard potential, the surrounding area and the safety measures. Items marked with an asterisk (*) are generally only applicable to production facilities.
4 Documentation used for the risk report, particularly test results, empirical data, literature references, results of calculations and detailed analyses, are to be kept at the disposal of the enforcement authority.
2 Basic data
21 Establishment and surrounding area
- -
- Description of the establishment, together with a site plan, including any permits or planning approvals,
- -
- characterisation of the establishment,
- -
- names of the persons responsible,
- -
- information on the surrounding area, together with a general plan.
22 Activities involving organisms
- -
- Risk assessment in accordance with Article 8 of the Containment Ordinance of 9 May 20122; in particular, the identity and characteristics of the organisms and the nature and scale of the activity,
- -
- the purpose of the contained use,
- -
- the culture volumes,
- *
- the nature of the intended product and of any by-products which are or may be produced in the course of the activity.
23 Installation
- -
- Description of the sections of the installation,
- *
- the maximum number of persons working in the installation and of persons working directly with the microorganisms.
24 Waste, wastewater and exhaust air
- -
- Types and quantities of waste and wastewater arising from the use of organisms,
- -
- ultimate form and destination of inactivated wastes.
25 Safety measures
- -
- Class of the activity in accordance with the Containment Ordinance
- -
- measures specified in the Containment Ordinance,
- -
- measures taken to prevent major accidents,
- -
- measures taken to limit the effects of major accidents.
3 Analysis
31 Methods
- -
- Description of the methods used.
32 Hazard potentials
- -
- Overview and characterisation of the main hazard potentials.
33 Main major accident scenarios
- -
- Possible causes of major accidents,
- -
- description of significant release events and their effects, based on dispersal considerations,
- -
- description of the extent of possible harm to the public or damage to the environment,
- -
- estimate of the likelihood of occurrence, given the safety measures in place.
4 Conclusions
- -
- Account of the risk, given the safety measures in place,
- -
- estimate of the risk posed by the establishment.
5 Summary of the risk report
- -
- Characterisation of the establishment and of the main hazard potentials,
- -
- description of the safety measures,
- -
- description of the main major accident scenarios,
- -
- estimate of the risk posed by the establishment.
1 Revised by Annex 5 No 2 of the Containment O of 25 Aug. 1999 (AS 1999 2783), Annex 5 No 7 of the Containment O of 9 May 2012 (AS 2012 2777) and No II para. 2 of the O of 29 April 2015, in force since 1 June 2015 (AS 2015 1337).
2 SR 814.912
Annex 4.3
(Art. 6)
Transport routes
1 Principles
1 The risk report must contain all the information required by the enforcement authority in order to verify and assess, in accordance with Article 7, the risk posed by the transport route to the public or the environment. This includes, in particular, all the information listed in numbers 2-5.
2 In justified cases, certain items of information may be omitted or replaced by others which are equally valid or more appropriate.
3 The scope and degree of detail of the information given for each item will depend on the specific circumstances; in particular, consideration is to be given to the specific features and location of the transport route, the surrounding area, the volume and structure of traffic, accident statistics and safety measures.
4 Documentation used for the risk report, particularly test results, empirical data, literature references, results of calculations and detailed analyses, are to be kept at the disposal of the enforcement authority.
2 Basic data
21 Transport route and surrounding area
- -
- Description of the transport route, together with a site plan,
- -
- information on the structure of the transport route and technical and organisational data,
- -
- information on safety equipment,
- -
- information on the surrounding area, including a general plan.
22 Volume and structure of traffic and accident statistics
- -
- Traffic data, such as the total volume of traffic and the proportion of heavy goods traffic,
- -
- data on the volume of dangerous goods traffic as a proportion of total heavy goods traffic,
- -
- data on the accident rate, accident black spots and general accident statistics.
23 Safety measures
- -
- Regulations applied and experience,
- -
- measures taken to reduce the hazard potential,
- -
- measures taken to prevent major accidents,
- -
- measures taken to limit the effects of major accidents.
3 Analysis
31 Methods
- -
- Description of the methods used,
- -
- description of the survey method used to determine the proportion of dangerous goods traffic.
32 Hazard potentials
- -
- Overview and characterisation of the main hazard potentials.
33 Main major accident scenarios
- -
- Possible causes of major accidents,
- -
- description of significant release events and their effects, based on dispersion considerations,
- -
- description of the extent of possible harm to the public or damage to the environment,
- -
- estimate of the likelihood of occurrence, given the safety measures in place.
4 Conclusions
- -
- Account of the risk, given the safety measures in place,
- -
- estimate of the risk posed by the transport route.
5 Summary of the risk report
- -
- Characterisation of the transport route and of the main hazard potentials,
- -
- description of the safety measures,
- -
- description of the main major accident scenarios,
- -
- estimate of the risk posed by the transport route.
Annex 4.41
(Art. 6)
Pipeline installations
1 Principles
1 The risk report must contain all the information required by the enforcement authority in order to verify and assess, in accordance with Article 7, the risk posed by the pipeline installation to the public or the environment. This includes, in particular, all the information listed in numbers 2-5.
2 In justified cases, certain items of information may be omitted or replaced by others which are equally valid or more appropriate.
3 The scope and degree of detail of the information given for each item will depend on the specific circumstances; in particular, consideration is to be given to the specific type of pipeline installation, its hazard potential and the surrounding area, as well as to safety measures.
4 Documentation used for the risk report, particularly test results, empirical data, literature references, results of calculations and detailed analyses, are to be kept at the disposal of the enforcement authority.
2 Basic data
21 Pipeline installation and surrounding area
- -
- Description of the pipeline installation, together with a route/site plan,
- -
- information on the structure of the pipeline installation and technical and organisational data,
- -
- information on safety equipment,
- -
- information on the surrounding area, including a general plan.
22 Safety measures
- -
- Technical standards,
- -
- measures taken to reduce the hazard potential,
- -
- measures taken to prevent major accidents,
- -
- measures taken to limit the effects of major accidents.
3 Analysis
31 Methods
- -
- Description of the methods used.
32 Hazard potentials
- -
- Overview and characterisation of the main hazard potentials.
33 Main major accident scenarios
- -
- Possible causes of major accidents,
- -
- description of significant release events and their effects, based on dispersion considerations,
- -
- description of the extent of possible harm to the public or damage to the environment,
- -
- estimate of the likelihood of occurrence, given the safety measures in place.
4 Conclusions
- -
- Account of the risk, given the safety measures in place,
- -
- estimate of the risk posed by the pipeline installation.
5 Summary of the risk report
- -
- Characterisation of the pipeline installation and of the main hazard potentials,
- -
- description of the safety measures,
- -
- description of the main major accident scenarios,
- -
- estimate of the risk posed by the pipeline installation.
1 Inserted by No II of the O of 13 Feb. 2013, in force since 1 April 2013 (AS 2013 749).
1 SR 814.012 SR 814.203 Amended by No I of the O of 13 Feb. 2013, in force since 1 April 2013 (AS 2013 749).4 Inserted by No I of the O of 21 Sept. 2018, in force since 1 Nov. 2018 (AS 2018 3505).5 Originally before Art. 11a.
For comments and observations: Official Publications Centre
Back to topLast update: 16.02.2019